Updates and Improvements in PM2

Narendra Agarwal

April, 2026 |

Several upgrades have been implemented in PM2 to improve process control, consistency, and machine performance.

  1. Stock furnish automation – Manual bagasse batch preparation replaced with PLC-based system for better control and consistency
  2. Robo shower installation – Automatic alternate operation improved wire cleaning and resolved wrinkle issues
  3. Consistency controller at machine chest – Helps maintain stable and uniform pulp consistency
  4. Stock flow through flow meter – Shift from manual calculation to actual flow measurement reduced GSM variation
  5. Sizing system upgrade (AKD) – Changed from acidic to AKD sizing for improved quality and stability
  6. Headbox modification – Baffling added to improve flow distribution and formation
  7. Raw material optimization – Bagasse TDR shifted to PM2 stock for better utilization
  8. Fiber loss optimization – One bottle/leg of TCC shut to reduce fiber loss
  9. Forming board installation – Improved sheet formation
  10. HP shower in pickup felt – Introduced for better felt cleaning and machine performance

Sincerely,
Narendra Agarwal

5 1 vote
Article Rating
guest

This site uses Akismet to reduce spam. Learn how your comment data is processed.

0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments
Back to top button
0
Would love your thoughts, please comment.x
()
x